Question No.211

Sally and Sara sell flower pots at their garage sale. Sally motivates Sara mentioning that they will sell a minimum of 15 pots per day if the outside temperature exceeds 60o F. From a sample, whose population is assumed to follow a Normal Distribution, taken for 30 days at 60 degrees or more an average of 13.6 pots per day were sold with a Standard Deviation of 0.7 pots. For the sales accomplished above, what test would validate if they met their requirements?

  1. F Test

  2. Test for Equal Variance

  3. Chi Square Test

  4. One-Sample t-Test

Correct Answer: D

Question No.212

A Belt rearranged the location of the parts inventory for a rework station locating the most often used parts to be within hand reach of the repair person. This rearrangement resulted in quicker repair times by eliminating one of seven major elements of waste which is the Waste of

.

  1. Motion

  2. Conveyance

  3. Inventory

  4. Waiting

Correct Answer: A

Question No.213

Special Cause Variation falls into which two categories? (Note:There are 2 correct answers).

  1. Natural

  2. Short term

  3. Assignable

  4. Pattern

Correct Answer: CD

Question No.214

Accuracy can be assessed in several ways and a fairly accurate means of measurement is visual comparison.

  1. True

  2. False

Correct Answer: B

Question No.215

A(n) is best used to compare a Machine 1 average quality characteristic to the same quality characteristic of Machine 2.

  1. F test

  2. 1-Sample t-test

  3. 2-Sample t-test

  4. ANOVA test

    Correct Answer: C

    Question No.216

    Production Line 1 is able to complete 500 units per shift. Production Line 2 is able to finish 1,500 units per shift. Production Line 2 is 3 times faster than Production Line 1. This analysis is an

    example of Scale Data.

    1. Nominal

    2. Ratio

    3. Ordinal

    4. Interval

Correct Answer: B

Question No.217

Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a so those involved in the process know what to do when the critical metrics move out of spec.

  1. Response Plan

  2. Call List

  3. Chain-of-Command

  4. Defect Analysis Plan

Correct Answer: A

Question No.218

A problem in the Measurement System suggests that there is a lack of consistency in the measurement over time.

  1. Linearity

  2. Bias

  3. Stability

  4. Magnitude

Correct Answer: C

Question No.219

Sally and Sara sell flower pots at their garage sale. Sally motivates Sara mentioning that they will sell a minimum of 15 pots per day if the outside temperature exceeds 60o F. From a sample, whose population is assumed to follow a Normal Distribution, taken for 30 days at 60 degrees or more an average of 13.6 pots per day were sold with a Standard Deviation of 0.7 pots. The statistical Degrees of Freedom for this example are?

A.

1

B.

29

C.

30

D.

31

E.

2

Correct Answer: B

Question No.220

Use this data to calculate the Z score. Average oF.65, Standard Deviation: 3, Upper Spec Limit: 72

A. 0.27

B.

1.5

C.

2.33

D.

4.12

Correct Answer: C

Get Full Version of the Exam