Question No.201

Measurement is defined as the difference between the observed and the expected values for a given set of data.

  1. Breadth

  2. Linearity

  3. Range

  4. Bias

Correct Answer: D

Question No.202

A fundamental rule is that both Standard Deviation and Variance can be added.

  1. True

  2. False

Correct Answer: B

Question No.203

If a process has subgroups for Variable data and the process runs for a long period of time, then the best pair of SPC Charts to use would be an Xbar and .

  1. NP Chart

  2. Individuals Chart

  3. R Chart

  4. C Chart

Correct Answer: C

Question No.204

Of the various types of data shown which is NOT representative of Variable Data.

  1. Child#39;s height is 4 foot 3 inches

  2. Three employees wore hard hats

  3. Car burned 2.7 gallons of gasoline

  4. Train was going 140 kilometers per hour

Correct Answer: B

Question No.205

Questions that can be best answered by a Visual Factory include all of these except

.

  1. Are downtime issues easily noted?

  2. Can extra inventory be seen easily?

  3. Are unneeded tools or supplies easily noted?

  4. Are setups optimized for lower scrap levels?

Correct Answer: D

Question No.206

When we compare short-term and long-term Capability which of these is true?

  1. Cp is better for the short term

  2. Both short-term and long-term performance are alike

  3. Performance tends to improve over time

  4. Cp is better for the long-term

Correct Answer: A

Question No.207

Which of these elements are not included in Implementation plans?

  1. Work breakdown structure

  2. Risk management plans

  3. Cost/Benefit ratios

  4. Planned audits of work completion

Correct Answer: C

Question No.208

Following process modifications, the Null Hypothesis states that no improvement to the process has occurred. If we discover the Null Hypothesis Test was rejected when it was false that would be a(n) .

  1. Alpha Error

  2. Type I Error

  3. Type II Error

  4. Type III Error

Correct Answer: C

Question No.209

Which of these are examples of business metrics or Key Performance Indicators commonly referred to as KPI#39;s?

  1. Cycle Time

  2. Defects

  3. No. of Units Reworked

  4. Labor Hours

  5. All of these answers are correct

Correct Answer: E

Question No.210

If you can Poka-Yoke a defect out of the process entirely then you do not need use SPC on the characteristic of interest in the defect.

  1. True

  2. False

Correct Answer: A